Oblogo 1 Landfill Gas Recovery and Flaring Project - GSC record withdrawn
[]
Host party(ies) Ghana
Methodology(ies) AMS-III.G. ver. 7
Standardised Baselines N/A
Estimated annual reductions* 22,294
Start date of first crediting period. 01 May 12
Length of first crediting period. 10 years
DOE/AE Bureau Veritas India Pvt. Ltd.
Period for comments 29 Apr 12 - 28 May 12
PP(s) for which DOE have a contractual obligation EAO Utility (Gh) Ltd., Accra.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1002 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs