Biomass based power project by Shri Shyam Warehousing and Power Pvt. Ltd.
[]
Host party(ies) India
Methodology(ies) AMS-I.D. ver. 16
Standardised Baselines N/A
Estimated annual reductions* 53,887
Start date of first crediting period. 01 Jul 11
Length of first crediting period. 7 years
DOE/AE LRQA Ltd
Period for comments 02 Feb 11 - 03 Mar 11
PP(s) for which DOE have a contractual obligation Shri Shyam Warehousing and Power Pvt Ltd
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (413 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Prime lending rate chosen as benchmark is not appropriate as per investment analysis guidelines. 
2.	The source for input values chosen is documented in the PDD. 
3.	Generation based on PLF and no of operating hours of the plant should be included for the sensitivity analysis. 
4.	When was the board meeting and investment decision , chronology of events not discussed in the PDD. 
5.	Leakage due to transportation of biomass into the project activity is not calculated.
6.	Qbiomass,y,i is not biomass fired into the boiler. Actually it is biomass procured from the supplier. Biomass that is fired should be monitored. No of trucks, distance travelled, load/truck should be recorded for the calculation of leakage.
7.	The basis of taking boiler efficiency as 75% is not correct. Pls. clarify. 
8.	During tripping of turbine due to emergency, electricity will be imported. This aspect is not discussed in the PDD. 
9.	Gross generation, auxiliary consumption, in-plant consumption of electricity should be monitored if not possible indirectly. 
10.	Steam generation, pressure of steam temperature of steam, feed water inlet temperature should be monitored on hourly basis. 
11.	Auxiliary fuel that will be consumed should be monitored. 
Submitted by: Fernandis


The comment period is over.