Recovery and Utilization of Associated Gas to Optimize Power Generation at PETROAMAZONAS Block 15 Facilities
[]
Host party(ies) Ecuador
Methodology(ies) AM0009 ver. 5
Standardised Baselines N/A
Estimated annual reductions* 97,019
Start date of first crediting period. 01 Jan 13
Length of first crediting period. 10 years
DOE/AE DNV-CUK
Period for comments 01 May 12 - 30 May 12
PP(s) for which DOE have a contractual obligation Tricorona Carbon Asset Management Pte Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (768 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs