SFPL Solar Power CDM Project
[]
Host party(ies) India
Methodology(ies) AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated annual reductions* 3,158
Start date of first crediting period. 01 Sep 11
Length of first crediting period. 10 years
DOE/AE PJR CDM
Period for comments 27 Jul 11 - 25 Aug 11
PP(s) for which DOE have a contractual obligation Singhal Forestry Private Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (316 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
This PDD does not give any information on the input parameters and assumptions used. This is not conforming to CDM requirement where the reader should be in a position to construct the worksheet and arrive at the same results. Since no information is given, this requirement is not fulfilled. Hiding information only proves that the project is not additional and has been made additional. Otherwise there is no reason why the PP should hide information from global stakeholders. Therefore, this project should not be taken up for validation by DOE unless the PP re-webhosts the PDD with all information. EB is requested not to accept this project for registration, unless it is re-webhosted with all information.  
 
Submitted by: Karthikeyan


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs