Wastewater Treatment Project at Thaindo Palm Oil Factory, Lam Thap, Krabi Province, Thailand.
[]
Host party(ies) Thailand
Methodology(ies) AMS-III.H. ver. 13
AMS-I.D. ver. 15
Standardised Baselines N/A
Estimated annual reductions* 21,110
Start date of first crediting period. 01 Jul 10
Length of first crediting period. 10 years
DOE/AE RINA Services S.p.A.
Period for comments 02 Mar 10 - 31 Mar 10
PP(s) for which DOE have a contractual obligation Thaindo Palm Oil Factory Co., Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (402 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Additionality

Comment-I

Section-B.5
Being the least cost option for wastewater treatment, which also meets the legal discharge limit, the treatment of Palm Oil Mill Effluent (POME) in anaerobic open lagoons without biogas capture is a prevalent and standard industry practice in Thailand.

The above statement should be elaborated with a complete detailed analysis considering the existing palm oil mills in operation in Thailand ??? 

Comment-II

Section-B.5
What is the basis of calculating the project IRR for a period of 15 years ??

Comment - III

Section-B.5
Why has the PP considered a fix electricity tariff for the project ?? When in general there has been a increase in the electricity tariff prices over the past few years ??? 

Also considering an average electricity tariff for the last 4 years is not conservative since the lowest electricity tariff in the last three years viz. 2006,07,08 has been more than the tariff assumed for computation of IRR viz. 2.31 baht/kWh. 

I understand that in order to present a conservative financial analysis the PP should consider a escalation in electricity tariff prices for computation of project IRR or in case a escalation is not considered then the highest electricity tariff available in the last few years should be considered for computation of project IRR.
Submitted by: NEAN


The comment period is over.