Small Hydro Power Project by Kurmi Energy Private Limited
[]
Host party(ies) India
Methodology(ies) AMS-I.D. ver. 16
Standardised Baselines N/A
Estimated annual reductions* 31,088
Start date of first crediting period. 01 Apr 11
Length of first crediting period. 10 years
DOE/AE DNV-CUK
Period for comments 24 Jul 10 - 22 Aug 10
PP(s) for which DOE have a contractual obligation Kurmi Energy Private Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (269 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
1. BSE 200's data is available since january 1991, PP should justify using a short period of 5 years for calculation as it would not depict the unsystematic risk of the market in such a short period.
2. Companies like GIPCL and BF UTILITIES are not included in BSE 200's basket. Justification is required for equity beta calculation based on BSE 200.
3. PP required to justify for non inclusion of companies like GVK power and Torrent power which were available during decision making time.
4. PP required to show any incentives like subsidies in the PDD as well as in the cash flow as revenue for calculating IRR as per sectoral and national policies under E-.

Submitted by: Arnab deb


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs