Filmax Biomass Thermal Energy Project
[]
Host party(ies) Malaysia
Methodology(ies) AMS-I.C. ver. 13
Standardised Baselines N/A
Estimated annual reductions* 22,033
Start date of first crediting period. 01 May 09
Length of first crediting period. 7 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 25 Nov 08 - 24 Dec 08
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (523 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
1. Para 23 of AMS I.C. has to be considered to develop methodological choices for calculation of Emission reductions.
2. Provision for biomass leakage monitoring is provided but methodological choice for calculation of leakage is not provided in section  B.6 of PDD.
3. Further DOE should validate the possible use of fossil fuel, if technically it is possible in project activity.
Submitted by: takarkhede atul


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs