Baihubao Phase II 49.5MWWind Power Generation Project in Shanxi Province
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 84,767
Start date of first crediting period. 01 Apr 12
Length of first crediting period. 7 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 14 Sep 11 - 13 Oct 11
PP(s) for which DOE have a contractual obligation Shanxi Fuguang Wind Power Co., Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1207 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Interim Rules on Economic Assessment of Electrical Engineering Retrofit Projects is not applicable to wind projects in benchmark IRR selection.

Benchmark of pre-tax project IRR is 5% for wind projects as indicated in Economic Evaluation Methods and Parameters for Construction Projects (3rd Edition), jointly issued by NDRC and Ministry of Construction on July 3, 2006. This document is the compilation basis of financial analysis for wind projects, which is widely used in China (http://www.hydrocost.org.cn/costSoftware/windsoftware.jsp).
Submitted by: fengdian


The comment period is over.