Parque Ambiental Los Pocitos Landfill Gas Utilization Project
[]
Host party(ies) Colombia
Methodology(ies) ACM0001 ver. 11
Standardised Baselines N/A
Estimated annual reductions* 72,382
Start date of first crediting period. 01 Jan 11
Length of first crediting period. 7 years
DOE/AE TUEV-RHEIN
Period for comments 04 Jun 10 - 03 Jul 10
PP(s) for which DOE have a contractual obligation Sociedad de Acueducto, Alcantarillado y Aseo de Barranquilla S.A. E.S.P.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (2215 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs