Installation of waste heat recovery system in a steel plant in Caofeidian, China
[]
Host party(ies) China
Methodology(ies) ACM0012 ver. 3
Standardised Baselines N/A
Estimated annual reductions* 557,712
Start date of first crediting period. 01 Jun 10
Length of first crediting period. 10 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 26 Jan 10 - 24 Feb 10
PP(s) for which DOE have a contractual obligation Nippon Steel Corporation (NSC)
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (759 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs