India FaL-G Brick and Blocks Project No.6
[]
Host party(ies) India
Methodology(ies) AMS-III.Z. ver. 4
Standardised Baselines N/A
Estimated annual reductions* 39,507
Start date of first crediting period. 01 Apr 15
Length of first crediting period. 10 years
DOE/AE SGS-UKL
Period for comments 29 Apr 14 - 28 May 14
PP(s) for which DOE have a contractual obligation Eco Carbon Pvt. Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1957 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs