Palmaceite Wastewater Treatment and Biogas Utilization Project
[]
Host party(ies) Colombia
Methodology(ies) AMS-III.H. ver. 16
AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated annual reductions* 14,209
Start date of first crediting period. 01 Jan 14
Length of first crediting period. 7 years
DOE/AE ICONTEC
Period for comments 14 Jun 12 - 13 Jul 12
PP(s) for which DOE have a contractual obligation Palmaceite S.A.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1489 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
I think this project is a great initiative. IT will help the environment and there are endless possibilities with what could come of the usage of the mitigated Methane Gas. A great idea would be to sell the excess energy to nearby communities.
Submitted by: Herbert B. Davila


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs