Wind power project at Gujarat by Powerica Limited
[]
Host party(ies) India
Methodology(ies) AMS-I.D. ver. 15
Standardised Baselines N/A
Estimated annual reductions* 32,542
Start date of first crediting period. 01 Jun 10
Length of first crediting period. 7 years
DOE/AE LRQA Ltd
Period for comments 05 Jan 10 - 03 Feb 10
PP(s) for which DOE have a contractual obligation Powerica Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1166 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:

The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs