Gansu Heihe Baopinghe Hydropower Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 339,884
Start date of first crediting period. 01 Jan 12
Length of first crediting period. 10 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 02 Oct 10 - 31 Oct 10
PP(s) for which DOE have a contractual obligation Gansu Shuangguan Hydropower Investment Co., Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (552 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
The project started construction on Sep. 28, 2009.
http://www.gsdthxsd.com/upfile/1/200910/10143320417b3.jpg
earlier than the decision date indicated in PDD.
Submitted by: shuidian


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs