Generation of electricity from 4x1.5 MW capacity Wind Mills by KRBL Limited at Ratan Ka Bas site, Jodhpur district, Rajasthan, India
[]
Host party(ies) India
Methodology(ies) AMS-I.D. ver. 15
Standardised Baselines N/A
Estimated annual reductions* 10,092
Start date of first crediting period. 01 Sep 10
Length of first crediting period. 10 years
DOE/AE TÜV NORD CERT GmbH
Period for comments 03 Jun 10 - 02 Jul 10
PP(s) for which DOE have a contractual obligation KRBL Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (521 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
If the prtoject is completely equity funded why isn't the proponent calculating Equity IRR and comparing it with ROE rather than Project IRR with WACC. Also if BSE 200 has been considered whether a short period or long period was taken. if short than proponent needs justify the short period.
Submitted by: Arnab deb


The comment period is over.