Hebei Shangyi Chaoligai 49.5MW Wind Farm Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 104,836
Start date of first crediting period. 01 Jan 13
Length of first crediting period. 7 years
DOE/AE China Environmental United Certification Center Co., Ltd.
Period for comments 20 Apr 12 - 19 May 12
PP(s) for which DOE have a contractual obligation Deutsche Bank AG, London Branch
Shangyi County Chahaer Wind Power Co., Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (473 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:

The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs