Solar Power Company 94 MW Solar PV Project
[]
Host party(ies) Thailand
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 83,429
Start date of first crediting period. 01 Nov 12
Length of first crediting period. 7 years
DOE/AE Germanischer
Period for comments 10 Jan 12 - 08 Feb 12
PP(s) for which DOE have a contractual obligation EDF Trading Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (675 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
PDD is totally unreadable. There list 16 projects requesting CDM support, however prior CDM consideration is not traceable from http://cdm.unfccc.int/Projects/PriorCDM/notifications/index_html. Additionality demonstration is not transparent, including WACC calculation, project IRR calculation for each activity. Such PDD can only lead readers of suspicion in cheating CDM revenues.
Submitted by: Floria


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs