Palo Viejo Hydroelectric Project
[]
Host party(ies) Guatemala
Methodology(ies) ACM0002 ver. 11
Standardised Baselines N/A
Estimated annual reductions* 248,713
Start date of first crediting period. 01 Jun 11
Length of first crediting period. 7 years
DOE/AE DNV-CUK
Period for comments 18 Aug 10 - 16 Sep 10
PP(s) for which DOE have a contractual obligation Enel Trade S.p.A (owner of Renovables de Guatemala, S.A.)
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (4832 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs