Clean fuel switch with natural gas utilisation at captive power plant of NRL
[]
Host party(ies) India
Methodology(ies) AMS-III.B. ver. 14
Standardised Baselines N/A
Estimated annual reductions* 43,792
Start date of first crediting period. 01 Jan 11
Length of first crediting period. 10 years
DOE/AE DNV-CUK
Period for comments 15 Jul 10 - 13 Aug 10
PP(s) for which DOE have a contractual obligation Numaligarh Refinery Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (285 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
THe additionality of the project is not well established. I dont think the barrier indicated is a good reason for that. Natural Gas is chepaer as compared to Naphtha and that is a reason of shifting. Moreover, the price of naphtha is very fluctuating. I think the DOE should also look into financial additionality using levelised cost of generation or NPV.

Secondly, what will be the change in lifetime of equipment can also be addressed with respect to levelised cost of generation.
Submitted by: ashish pathak

Q 1) What were the steps taken to secure CDM status for the project between 2005-06?
Q 2) When did NRL first decide to obtain revenue from CDM, what are the evidences towards the same? And since NRL had signed an agreement in March 2005 for procurement of NG with OIL and in June 2005 for transportation of NG with AGCL, the purpose of the gas and associated expenses would have been calculated and CDM would have been considered. Could evidences be shown that CDM was seriously considered during the project conceptualisation?
Q 3) Entering an agreement creates a binding contract. NRL entered into agreements with OIL and AGCL , and thereby should be treated as start date of the project. Since NRL had signed an agreement in March 2005 for procurement of NG and in June 2005 for transportation of NG, the project proponent should consider either of these two dates of agreement as the start date of the project activity. 
Q 4) How was the tender document for CDM Advisor issued in June 2007, when the Board approved the Project in 2008?
Q5) When was the CDM eligibility assessment done by the Company? And how was CDM eligibility assessment communicated to the Board? Which resulted in issuance of the tender document in 2007 and a Board decision in 2008?
Submitted by: Sandy

The Company's Annual Reports do not mention about the NG utilization to be considered as CDM project in any of the Annual Reports displayed in the Company's web site.
Submitted by: Sandy