Huadian Gansu Jiayuguan 10MWp Grid-connected Photovoltaic Power Project
[]
Host party(ies) China
Methodology(ies) AMS-I.D. ver. 16
Standardised Baselines N/A
Estimated annual reductions* 14,648
Start date of first crediting period. 01 Jan 12
Length of first crediting period. 7 years
DOE/AE Germanischer
Period for comments 13 Apr 11 - 12 May 11
PP(s) for which DOE have a contractual obligation Arreon Carbon Trading Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (827 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
1. As per Table 2.13-1 in the Economic Assessment Method and Parameters for Construction Projects (Ver.03), benchmark of pre-tax project IRR is 5% for such kind of projects.

2. How to understand the project tendering was taken before the investment decision (http://www.projectbidding.cn/zaobiao/gonggao/20091106/0850194957.html). 

3. Construction started on 26/04/2010 (http://www.gstb.gov.cn/showmsg.asp?name=%B8%CA%CB%E0%B7%E7%C3%B2&ID=3242).
Submitted by: jia.wan


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs