Waste Heat Recovery based power generation by Shree Cement Limited at Ras, Rajasthan, India
[]
Host party(ies) India
Methodology(ies) ACM0012 ver. 4
Standardised Baselines N/A
Estimated annual reductions* 155,349
Start date of first crediting period. 01 Jan 12
Length of first crediting period. 10 years
DOE/AE SGS-UKL
Period for comments 09 Jul 11 - 07 Aug 11
PP(s) for which DOE have a contractual obligation Shree Cement Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (481 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Comment (209 KB) Submitted by: E-0010 SGS official account


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs