Ulan Tsab Siziwang Banner 40MWp PV Generation CDM Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 63,312
Start date of first crediting period. N/A
Length of first crediting period. 7 years
DOE/AE CEPREI certification body
Period for comments 22 Sep 11 - 21 Oct 11
PP(s) for which DOE have a contractual obligation Equity + Environmental Assets Ireland Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1343 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs