Maracana Small Hydropower Project
[]
Host party(ies) Brazil
Methodology(ies) AMS-I.D. ver. 16
Standardised Baselines N/A
Estimated annual reductions* 9,991
Start date of first crediting period. 01 Dec 11
Length of first crediting period. 10 years
DOE/AE DNV-CUK
Period for comments 09 Apr 11 - 08 May 11
PP(s) for which DOE have a contractual obligation Maracanã Energética S.A.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (566 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs