Massive introduction of Compact Fluorescent Lamps (CFLs) to households in Ecuador
[]
Host party(ies) Ecuador
Methodology(ies) AM0046 ver. 2
Standardised Baselines N/A
Estimated annual reductions* 439,247
Start date of first crediting period. 01 Apr 09
Length of first crediting period. 10 years
DOE/AE TÜV NORD CERT GmbH
Period for comments 23 Sep 10 - 22 Oct 10
PP(s) for which DOE have a contractual obligation Deutsche Bank AG, London Branch
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (670 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs