N2O and NOX Abatement Project at KIMA Fertilizer Plant in Aswan (Egypt)
[]
Host party(ies) Egypt
Methodology(ies) AM0028 ver. 5
Standardised Baselines N/A
Estimated annual reductions* 109,989
Start date of first crediting period. 01 Jan 14
Length of first crediting period. 10 years
DOE/AE TÜV NORD CERT GmbH
Period for comments 08 Aug 12 - 06 Sep 12
PP(s) for which DOE have a contractual obligation First Climate (Switzerland) AG
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1165 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Comment (98 KB) submitted by: Christopher Brandt on behalf of Climate Concept Foundation / Christopher Brandt


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs