HPP José Luiz Müller de Godoy Pereira (JUN1173), Brazil
[]
Host party(ies) Brazil
Methodology(ies) ACM0002 ver. 13
Standardised Baselines N/A
Estimated annual reductions* 39,040
Start date of first crediting period. 01 Jan 14
Length of first crediting period. 7 years
DOE/AE IBOPE
Period for comments 02 Mar 13 - 31 Mar 13
PP(s) for which DOE have a contractual obligation Foz do Rio Claro Energia S.A
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (504 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs