GHG emission reduction through power generation at high efficiency
[]
Host party(ies) India
Methodology(ies) ACM0013 ver. 4
Standardised Baselines N/A
Estimated annual reductions* 688,369
Start date of first crediting period. 01 Apr 13
Length of first crediting period. 10 years
DOE/AE KBS Certification Services Limited
Period for comments 13 Jul 11 - 11 Aug 11
PP(s) for which DOE have a contractual obligation Godawari Energy Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (2989 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
I request PP to please follow the investment analysis guideline (EB62, Annex 5), paragraph 19 on investment comparison and benchmark analysis.
This paragraph clearly describes that "The benchmark approach is therefore suited to circumstances where the baseline does not require
investment or is outside the direct control of the project developer, i.e. cases where the choice of the developer is to invest or not to invest."
As I understand the project activity is construction of new supercritical power plant and does not forces PP to invest anyhow, PP may please clarify the use of investment comparison analysis for demonstration of additionality.
Submitted by: Ankush Jain

Comment (253 KB) submitted by: Justin Guay on behalf of Justin Guay, Sierra Club

The discussion and dismissal of alternatives are not in compliance with the Methodology. As per the Methodology alternatives can be excluded only if they are not in compliant with all applicable legal and regulatory requirements. Alternatives which are compliant with applicable legal and regulatory requirements, The CDM-PDD should submit for validation a clear comparison of the financial indicator for all scenario alternatives. Therefore dismissal of alternatives citing reasons such as non-availability, high operating cost or inconsistent availability is not conforming to methodological requirements though it helps the consultant from providing calculation. The presentation does not satisfy ACM 0013

Facing stiff regulatory barriers is not given as one of the acceptable reasons for dismissing the alternative in the methodology. Therefore, omission of nuclear option is not conforming to methodology. It is not correct to state that nuclear power is restricted to Govt. or Govt. owned companies. With Govt. holding 51% share capital, it can be managed by private sector. Does the law prohibit this? 

Therefore, restricting the alternatives to sub critical (probably pit head plant as nowhere it is stated whether it is pit head, linkage or imported coal based plant) is not correct

Methodology requires the investment analysis should be presented in a transparent manner and all the relevant assumptions should be provided in the CDM-PDD, so that a reader can reproduce the analysis and obtain the same results. The whole paragraph in the methodology in p4/18 describes the information to be presented. PDD states “this assessment may be verified during validation”! 

No information has been given on the alternatives and the information given on the project activity in sec. B.5 is minimal and of very little use. IT does not give the project cost, does not give tariff for supply to grid and merchant power sale - the most important information for any global stakeholder to comment on the additionality.. This is not conforming to methodological requirements. Likewise the methodology requires presentation of sensitivity analysis, which is absent in the PDD.

The PDD projects SHR at 2300. Let the consultant go through other webhosted super critical projects. Not even a single project has assumed such a high heat rate. So also the O&M cost at Rs.16.34 lakhs/MW. 

While the IRR is given in sec. B.4, it is conveniently omitted in Sec. B.5 and LCEP is used to demonstrate additionality. Even sec. B.5 is not giving any information on the sensitivity analysis. Is LECP is considered appropriate financial indicator for the project type and decision making context? This does not satisfy additionality tool or the methodology. 

The company reports that it has signed  MOU with Chhatisgarh Govt on Sept. 17,2008, while the Board decision is stated as May 15, 2010, that is 1 year and 8 months after. How can a company sign MOU without even taking a decision to set up this project. This is done only to overcome the lapse on the part of the project developer in complying to with Annex 22, EB 49.  

DOE should not take up this project for validation as this does not fulfil methodological requirements. It should be re-webhosted with all information so that any reader can reproduce the worksheet and arrive at the same results
Submitted by: Karthikeyan


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs