Yunnan Yuanyang Fengchunling 2nd Level Small Hydropower Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 26,986
Start date of first crediting period. 01 Jan 13
Length of first crediting period. 7 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 14 Feb 12 - 14 Mar 12
PP(s) for which DOE have a contractual obligation Climate Bridge Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (745 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
1. 10% benchmark is an pre-tax indicator while it is used as post-tax in this project.
    Reference: page 51 in SL 16-2010 which also links the info on page 204 in Project Financial Assessment Methods and Indicators (3rd edition)
    Hence the project is financially feasible with prevailing tariff (0.215 CNY/kWh) in the region.

2. From the satistics of provincial grid company, the project was initially planned with 3.2 MW and 6028 operational hours per annum (http://webcache.googleusercontent.com/search?hl=zh-CN&gbv=2&gs_sm=12&gs_upl=23484l23484l0l24656l1l1l0l0l0l0l110l110l0.1l1l0&q=cache:74Ej6zQrPHMJ:http://www.yunnanpower.cn/showinfo.asp?id=1801+http%3A//www.yunnanpower.cn/showinfo.asp%3Fid%3D1801&ct=clnk). What is the concern when expanding the installed capacity 3 times, but only with double power output?
Submitted by: shuidian


The comment period is over.