Kretam Wastewater Biogas Recovery and Utilisation Project (the "Project"), in Sandakan, Sabah, Malaysia
[]
Host party(ies) Malaysia
Methodology(ies) AMS-III.H. ver. 16
AMS-I.F. ver. 2
AMS-I.A. ver. 14
Standardised Baselines N/A
Estimated annual reductions* 38,417
Start date of first crediting period. 01 Jan 12
Length of first crediting period. 7 years
DOE/AE SIRIM
Period for comments 02 Aug 11 - 31 Aug 11
PP(s) for which DOE have a contractual obligation Kretam Renewable Energy Sdn. Bhd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (766 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs