San Dionisio Wind Farm
[]
Host party(ies) Mexico
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 498,705
Start date of first crediting period. 15 Aug 13
Length of first crediting period. 7 years
DOE/AE Bureau Veritas India Pvt. Ltd.
Period for comments 18 Feb 12 - 18 Mar 12
PP(s) for which DOE have a contractual obligation Carbon Solutions de México, S.A. de C.V.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (530 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Comment (290 KB) submitted by: Christopher Benoit on behalf of ProDESC, PODER, Asamblea: For more information, feel free to call ProDESC in Mexico City at: +5552122230 /52122229

Comment (290 KB) submitted by: Christopher Benoit on behalf of ProDESC, PODER, Asamblea: For more information, feel free to call ProDESC in Mexico City at: +5552122230 /52122229


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs