Alashan Ayouqi 49.5MW Wind Farm
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 104,465
Start date of first crediting period. 01 Jan 12
Length of first crediting period. 7 years
DOE/AE TUEV-RHEIN
Period for comments 05 Nov 11 - 04 Dec 11
PP(s) for which DOE have a contractual obligation Inner Mongolia Jie Yuan Wind Power Generation Co., Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (601 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
The project started construction in July 2010 (http://www.alsxw.com/article/20110919/256937_1.html) and net power supply is much higher than the estimates in PDD, referring the previous link. The project can be implemented obviously without CDM revenue.
Submitted by: fengdian


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs