Xinjiang Ili Kukesu River Halajun Hydropower Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 13
Standardised Baselines N/A
Estimated annual reductions* 112,993
Start date of first crediting period. N/A
Length of first crediting period. 7 years
DOE/AE China Classification Society Certification Co., Ltd.
Period for comments 07 Sep 13 - 06 Oct 13
PP(s) for which DOE have a contractual obligation Xinjiang Ili Tekesi River Hydropower Development Co., Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (678 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:

The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs