CGN Qinghai Xitieshan Phase I 10MW Grid-connected Solar PV Power Generation Project
[]
Host party(ies) China
Methodology(ies) AMS-I.D. ver. 16
Standardised Baselines N/A
Estimated annual reductions* 14,963
Start date of first crediting period. 01 Oct 11
Length of first crediting period. 7 years
DOE/AE RINA Services S.p.A.
Period for comments 16 Mar 11 - 14 Apr 11
PP(s) for which DOE have a contractual obligation Arcadia Energy (Suisse) S.A.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1303 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs