Xinjiang Hami Southeast Wind Zone 2000MW Wind Farm Kushui First Wind Power Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 13
Standardised Baselines N/A
Estimated annual reductions* 398,812
Start date of first crediting period. 01 Jan 14
Length of first crediting period. 7 years
DOE/AE ERM-CVS
Period for comments 27 Sep 12 - 26 Oct 12
PP(s) for which DOE have a contractual obligation Datang Xinjiang Energy Development Co., Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1201 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs