Monterķa Landfill gas recovery and flaring
[]
Host party(ies) Colombia
Methodology(ies) AMS-III.G. ver. 6
Standardised Baselines N/A
Estimated annual reductions* 26,134
Start date of first crediting period. 01 Jul 10
Length of first crediting period. 7 years
DOE/AE Colombian Institute for Technical Standards and Certification
Period for comments 20 Apr 10 - 19 May 10
PP(s) for which DOE have a contractual obligation Optim Consult Ltda.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (285 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs