Cijevna Hydro Power Bundle Bosnia Herzegovina
[]
Host party(ies) Bosnia and Herzegovina
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 273,534
Start date of first crediting period. 01 Aug 15
Length of first crediting period. 7 years
DOE/AE Bureau Veritas India Pvt. Ltd.
Period for comments 25 Apr 12 - 24 May 12
PP(s) for which DOE have a contractual obligation Holding Technor Energy BH Technor Energy AS
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (584 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs