Shanxi Huairen Chaigou Coal Mine Ventilation Air Methane Destruction Project
[]
Host party(ies) China
Methodology(ies) ACM0008 ver. 7
Standardised Baselines N/A
Estimated annual reductions* 237,615
Start date of first crediting period. 01 Jul 11
Length of first crediting period. 7 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 29 Sep 10 - 28 Oct 10
PP(s) for which DOE have a contractual obligation Huairen Lianshun Xida Energy Co., Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (670 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
It is unclear the options for CBM and CMM or VAM extraction is pre-mining or post-mining. It is not convincing alternatives listed in methodology are eliminated. There are technologies can be applied for VAM utilization which generate electric and/or heat energy. Therefore investment analysis is not correctly applied to identify baseline scenario.
Submitted by: tianmaiqi