Reducing Gas Leakages within the Bakhrabad Gas Distribution Network in Bangladesh
[]
Host party(ies) Bangladesh
Methodology(ies) AM0023 ver. 4
Standardised Baselines N/A
Estimated annual reductions* 2,734,397
Proposed start date of PA 18 Dec 18
Start date of first crediting period. 01 Aug 19
Length of first crediting period. 10 years
DOE/AE RINA Services S.p.A.
Period for comments 21 Jun 19 - 20 Jul 19 (23:59:59 GMT)
PP(s) for which DOE have a contractual obligation EcoGas Asia Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (3160 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs