"6.65 MW Wind Energy Generation by M/s GTN Enterprises Limited" at Ganapathypalayam in Coimbatore, Radhapuram, Kvalakuruchi in Tirunelveli and Govindapuram in Erode district, Tamilnadu
[]
Host party(ies) India
Methodology(ies) AMS-I.D. ver. 15
Standardised Baselines N/A
Estimated annual reductions* 13,357
Start date of first crediting period. 01 Mar 10
Length of first crediting period. 10 years
DOE/AE SIRIM
Period for comments 30 Dec 09 - 28 Jan 10
PP(s) for which DOE have a contractual obligation GTN Enterprises Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (522 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs