Methane Recovery in Wastewater Treatment, Project AMA07-W-01, Perak, Malaysia
[]
Host party(ies) Malaysia
Methodology(ies) AMS-III.H. ver. 5
Standardised Baselines N/A
Estimated annual reductions* 57,452
Start date of first crediting period. 03 Dec 07
Length of first crediting period. 7 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 19 May 07 - 17 Jun 07
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs

The content you see inside this frame is located outside the UNFCCC CDM Website. If you have problems viewing the content in the frame, click here to access the web site directly.
   
UNFCCC Secretariat assumes no responsibility for the third-party content linked through its website