Jixi Coal Mine Methane Project
[]
Host party(ies) China
Methodology(ies) ACM0008 ver. 6
Standardised Baselines N/A
Estimated annual reductions* 1,838,575
Start date of first crediting period. 01 Jul 10
Length of first crediting period. 7 years
DOE/AE ERM-CVS
Period for comments 20 Jan 10 - 18 Feb 10
PP(s) for which DOE have a contractual obligation BNP Paribas
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1461 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Different severe deviations from power plant locations mentioned in PDD. Some of them more than 70 kms out of point of origin. Quite poor performance.
I have been there in different type of work and controlled all locations. You also might do the same - otherwise forget about some of your coordinates.
Submitted by: Andrea Hoelscher


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs