Shaanxi Luneng Jingbian Wind Farm Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 11
Standardised Baselines N/A
Estimated annual reductions* 83,073
Start date of first crediting period. 01 Jan 11
Length of first crediting period. 7 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 28 Aug 10 - 26 Sep 10
PP(s) for which DOE have a contractual obligation CF Carbon Fund II Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (844 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
No sufficient information in PDD supports the additionality of the project. The validating DOE should check basic information before starting the consultation process, such as how CDM was seriously considered in project implementation and so on.
Submitted by: fengdian


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs