Jeori Hydro-Electric Project
[]
Host party(ies) India
Methodology(ies) AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated annual reductions* 43,647
Start date of first crediting period. 01 Jun 14
Length of first crediting period. 7 years
DOE/AE DNV-CUK
Period for comments 05 Apr 12 - 04 May 12
PP(s) for which DOE have a contractual obligation Technology House (India) Private Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (779 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
1. Is the project applying for REC
2. Project was based on L1 tendering
3. In near future the project is claiming for REc, then it is not eligible for CDM.
4. CDM registration should be cancelled during verification stage, if the project is applying for REC, Open access, sale through exchanges.
5. Already Greenko Group is doing the same for CDM projects - Fake registration for all its projects.
5. "rauj natla vc maodha" which means project viable
Submitted by: Vijay Khangar

1, PPA to be examined - as the levelized cost calculation implies that, project is also for additional revenue - REC, open access, etc
2. Tariff should be more
3. Capital subsidy - pls elaborate
4. Local people are not emloyment - % of local people who will be hired later / during construction
5. DPR preparation team has to be intrwed - before dpr revision and after revision
6. Zenith is favoring PP
7. Thirumala has strong caste feeling - pls avoid and work for genuine project
Submitted by: Vijay Khangar

How local people are benefitted?
2. Pls share 2% of CER revenue as contribution to local people
3. local people lost land because of thirumala raju
Jeori is not a good project
Additionaliy is not clear
Loan / equity structuring has to be checked by evaluating the bank account statements
Submitted by: Vijay Khangar

Comment (104 KB) submitted by: Vijay Khangar on behalf of vijaykhangar@yahoo.com - contact in future for avoiding fake projects


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs