Yunnan Tengchong Yongxing River Second Level Hydropower Station
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 13
Standardised Baselines N/A
Estimated annual reductions* 56,748
Start date of first crediting period. 01 Oct 13
Length of first crediting period. 7 years
DOE/AE China Quality Certification Centre Co., Ltd.
Period for comments 07 Sep 12 - 06 Oct 12
PP(s) for which DOE have a contractual obligation Tengchong Houqiao Yongxing River Hydropower Exploitation Co., Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (966 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs