Power generation from biogas in Windhoek, Namibia
[]
Host party(ies) Namibia
Methodology(ies) AMS-III.H. ver. 16
AMS-I.C. ver. 19
Standardised Baselines N/A
Estimated annual reductions* 9,082
Start date of first crediting period. 01 Jan 13
Length of first crediting period. 10 years
DOE/AE CarbonCheck_Cert
Period for comments 20 Mar 12 - 18 Apr 12
PP(s) for which DOE have a contractual obligation Nedbank Group Limited
Cape Advanced Engineering (Pty) Ltd
City of Windhoek
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (959 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs