Guangxi Wuming Jiaolong Alcohol Production Wastewater Treatment Project
[]
Host party(ies) China
Methodology(ies) AMS-I.C. ver. 18
AMS-I.F.
AMS-III.H. ver. 15
Standardised Baselines N/A
Estimated annual reductions* 75,197
Start date of first crediting period. 01 Mar 11
Length of first crediting period. 10 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 10 Nov 10 - 09 Dec 10
PP(s) for which DOE have a contractual obligation voestalpine AG
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (824 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
The project uses equity benchmark while the project IRR is calculated for comparing. The item "Revenue on energy saving" is not understandable. Add-on cash flow should be used in financial analysis.
Submitted by: jia.wan


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs