Guangzhou Zhujiang Beer Methane Recovery Project
[]
Host party(ies) China
Methodology(ies) AMS-III.H. ver. 9
Standardised Baselines N/A
Estimated annual reductions* 44,662
Start date of first crediting period. 01 Jan 09
Length of first crediting period. 7 years
DOE/AE TÜV NORD CERT GmbH
Period for comments 10 Oct 08 - 08 Nov 08
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (9907 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
30 million RMB investment for 1.5 MW power generation is very high compare to similar projects. Further breakdown of the parameters and information should be provided with necessary documented evidence.
Submitted by: Long Yan


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs