Pure-low temperature Waste Heat Recovery Project for power generation (23MW) in Sichuan E’sheng Cement Holding Co.,Ltd .
[]
Host party(ies) China
Methodology(ies) ACM0012 ver. 3
Standardised Baselines N/A
Estimated annual reductions* 99,943
Start date of first crediting period. 01 May 10
Length of first crediting period. 10 years
DOE/AE emc
Period for comments 06 Mar 10 - 04 Apr 10
PP(s) for which DOE have a contractual obligation EnBW Trading GmbH
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1143 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs