RDF Power Projects Ltd. – Integrated Solid Waste Management Project
[]
Host party(ies) India
Methodology(ies) AM0025 ver. 11
Standardised Baselines N/A
Estimated annual reductions* 109,412
Start date of first crediting period. 01 Jan 11
Length of first crediting period. 10 years
DOE/AE DNV-CUK
Period for comments 26 Mar 10 - 24 Apr 10
PP(s) for which DOE have a contractual obligation RDF Power Projects Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (910 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
First of All it is a Great Iniatiative by the entrepenuer.
It is mentioned in the pdd of the usage of 25% Biomass.So,what are the Biomass available and its availability near the project site.The Price of Biomass per Tonne in Andhra Pradesh is increasing to the extent that some Biomass Power Plants have faced closure.What are the steps taken to ensure a smooth availability of Biomass and at a nominal price. 
Submitted by: Abhishek Ghosh

Comment (45 KB) submitted by: ganesh margbandhu on behalf of ganesh margabandhu

Comment (45 KB) submitted by: ganesh margbandhu on behalf of ganesh margabandhu


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs