Nanhai MSW Incineration II Project
[]
Host party(ies) China
Methodology(ies) AM0025 ver. 11
Standardised Baselines N/A
Estimated annual reductions* 137,146
Start date of first crediting period. 01 Jan 11
Length of first crediting period. 7 years
DOE/AE Germanischer
Period for comments 21 May 10 - 19 Jun 10
PP(s) for which DOE have a contractual obligation Climate Bridge Ltd
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1867 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
According to the national policy, such kind of plant should run the whole year - 365 days, and the running time should more than 8000 hours. How the project reaches the standard if it runs only 330 days? Moreover, the project is located in a university town. 61.79% local students think the project should be halted as of not in the public interest, not to mention the bad quality during construction.
Submitted by: tianmaiqi


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs